Creating a New Form
This article explains how to create a new form in Buildend and configure its groups and fields so it can be used by your team.
Steps
- Click your avatar in the top right corner of Buildend and select Settings.
- In Settings, click Forms in the left navigation.
- Click Create New Form.
- Enter a Form Name to name your form.
- Select a Form Type to assign the form to Inspection, Safety, or Work Log.
- Before adding form fields, choose whether to add a Group or a List Group:
- Group allows you to add a fixed set of fields.
- List Group allows you to add fields that users can repeat by adding more rows when filling out the form.
- After adding a group, use Add a Field to select from the available field types and add them to the group.
- Repeat adding groups and fields as needed.
- Click Create Form to save the form.