Adding Cost Codes Using a CSV File
This article explains how to add multiple cost codes into Buildend at once by importing them from a CSV file.
Steps
- Navigate to Cost Codes and select Import Data.
- Click Download CSV Template to download the template file.
- Open the CSV template and note that it contains four columns:
- Cost Code
- Cost Name
- Description (optional)
- Parent Cost Code
- Fill in the required data in the CSV file.
- For a main cost code (for example, 01 – General Requirements):
- Set Cost Code to
01 - Set Cost Name to
General Requirements - Optionally add a Description
- Leave Parent Cost Code empty
- Set Cost Code to
- For a sub cost code (for example, 011000 – Summary):
- Set Cost Code to
011000 - Set Cost Name to
Summary - Optionally add a Description
- Set Parent Cost Code to
01to indicate it is a sub cost code of 01 – General Requirements
- Set Cost Code to
- Once all cost codes have been added and the CSV file is complete, return to Buildend and click Upload CSV File.
- Map the columns if they are not auto-filled, then select Next.
- Click Submit to create all cost codes provided in the CSV file.