How to Start a Takeoff
The Takeoff tool in Buildend allows you to measure and quantify project components directly from your drawings. Follow the steps below to start a takeoff:
- Select the Project you want to work on.
- Click on the Preconstruction tab.
-
Select Takeoff from the submenu.
You will see all the drawings that have been loaded from the Drawings tool.
- Choose the drawing where you want to perform the takeoff.
- Once a Takeoff Group has been created, click the ➕ (plus icon) on the left-hand side of the panel.
- Fill in the following details:
- Item Name
- Job
- Cost Code
- Select the Measurement Type. Available types include:
- Count
- Linear
- Linear with Drop
- Linear Volume
- Pitched Linear
- Area
- Surface Area
- Pitched Area
- Volume
- Click Submit to create the takeoff item.
- To begin measuring, select the Takeoff Item.
- Click from point to point on the drawing; double-click to complete the measurement.
Your measured quantities will automatically populate in the Estimate Worksheet, keeping your takeoff and estimate seamlessly connected.