Accessing Project Drawings
After logging into Buildend, follow these steps to access project drawings:
- Navigate to the project whose drawings you want to view.
- In the project tab, click on Documents, then select Drawings.
You’ll see a list of all available drawings, organized by drawing number, name, and revision.
- Click on the name of any drawing to open it in the drawing viewer.
In the viewer, you can:
- Mark up the drawing
- Download the drawing
- Switch between revisions by clicking on the revision number
This allows you to access both the latest and previous versions of any drawing.