If scanning a Buildend QR code isn’t opening the Buildend app directly, your device may not be set up to recognize the app’s verified links. Follow the steps below to fix this:
✅ Step 1: Open App Info for Buildend
Press and hold the Buildend app icon on your Android device.
Tap App info (or the small “i” icon).
✅ Step 2: Set App to Open Supported Links
In the App Info screen, select Open by default.
Ensure the Open supported links (or In this app) option is enabled.
✅ Step 3: Verify Buildend Links
Under the Verified links section, check the count:
If it shows 0, tap Add links.
Add this link:
app.buildend.com
Once added, the Verified links count should change to 1.
📲 Test It
Scan any Buildend QR code again. It should now automatically open in the Buildend app and take you to the correct form or project.
Still having issues? Contact Buildend support for further assistance.
