Internal vs External Users

Understand how Buildend distinguishes between internal and external users and how each user type affects access, visibility, and collaboration across the platform.


Table of Contents


Overview

Buildend distinguishes between internal and external users to help manage access, collaboration, and visibility across projects and Workspaces.

User access is controlled by the General Contractor that owns the Workspace. They determine which users can access the system, which projects they can participate in, and what actions they can perform through roles and permissions.

While both user types can collaborate within the same Workspace, their relationship to the organization and the information they can access may differ.


Internal Users

Internal users are members of the organization that owns the Workspace.

These users typically:

  • Work across multiple projects

  • Have broader visibility within the Workspace

  • May have administrative or configuration permissions (depending on their role)

  • Are responsible for managing projects, workflows, and company operations

Examples of internal users include:

  • Project Manager

  • Project Coordinator

  • Construction Administrator

  • Site Superintendent

  • Executive or Company Administrator


External Users

External users are individuals who belong to a different company than the Workspace owner.

These users are typically invited into the Workspace to collaborate on specific projects or activities.

External users typically:

  • Have access only to information relevant to their work

  • Participate in specific projects they have been assigned to

  • Do not have access to company-wide settings or administrative functions

  • Collaborate with the General Contractor and other project stakeholders

Examples of external users include:

  • Finish Carpenter

  • Electrical Contractor

  • Plumbing Contractor

  • Consultant

  • Architect

  • Client Representative

  • Vendor or Supplier Contact


Access & Permissions

A user's classification as internal or external does not automatically determine what they can see or do in Buildend.

Access is controlled through roles and permissions configured by the General Contractor that owns the Workspace.

These permissions determine:

  • Which projects a user can access

  • What information they can view

  • What actions they can perform

  • Whether they can access administrative or configuration features

As a result, two users of the same type may have different levels of access depending on their assigned role and permissions.


Why This Separation Matters

Separating users into internal and external categories helps:

  • Maintain secure access to company and project information

  • Ensure users only see information relevant to their responsibilities

  • Support collaboration with external organizations while protecting internal data

  • Simplify user administration and permission management

  • Provide a clear distinction between company personnel and external project participants