You can remove unwanted markups from a drawing in both the web and mobile versions of Buildend. Follow the steps below based on your device:
On Web (Desktop):
Open the Drawing that contains the markup.
Select the markup you want to delete.
Press the Delete or Backspace key on your keyboard.
The markup will be removed from the drawing.
On iOS and Android Apps:
Open the Drawing in the mobile app.
Tap to select the markup you wish to remove.
Tap the Delete icon that appears.
The markup will be deleted from the drawing.
This action permanently removes the selected markup from the drawing.