Revising a single drawing in Buildend allows you to maintain version control while keeping drawing history intact. Follow the steps below to revise an individual drawing:
Navigate to the Project where the drawing exists.
Click on Documents in the top menu, then select Drawings.
Find the drawing you want to revise, click on the Options menu (three dots), and select Revise Drawing.
In the Drawing Revision window:
Enter the Revision Name
Attach the PDF file that contains the revised version of the drawing.
Enter the Page Number where the revised drawing appears within the PDF:
If it’s a multi-page PDF, specify the correct page number.
If it’s a single-page PDF, the page number will be 1.
Click Upload Revised Drawing.
Once uploaded:
Open the drawing. The latest revision will be displayed by default.
Use the revision dropdown in the top drawing toolbar to switch between the current and previous versions.
This ensures your team always has access to the most up-to-date drawing while preserving historical revisions for reference.